Sonntag, 8. April 2012

Part 4 - All about bricks and concrete

This week, we’ve been busy focusing on building new walls in front of the internal walls on the first floor, by. Thick concrete bricks which span the width of the rooms were first laid all around the internal walls of the first floor. Then the whole lot was covered with cement. This was done to help strengthening the inside walls, and prevent them from collapsing.

After the inside foundation for the walls have been constructed, the actual wall itself was built next to the existing inside wall, all around the first floor. The wall is neatly built with a great chunk of insulation between – therefore allowing fresh air to circulate between both walls.

Keine Kommentare:

Kommentar veröffentlichen